MACTEC
Development Corp. |
| |||||||||||||
|
|
|
| |||||||||||
|
|
|
| |||||||||||
CONTRACT
INFORMATION: |
| |||||||||||||
|
|
|
| |||||||||||
Schedule
Title: |
Environmental
Advisory Services |
|
| |||||||||||
|
|
|
| |||||||||||
Industrial
Group: |
B |
|
| |||||||||||
|
|
|
| |||||||||||
Industrial
Class: |
899 |
|
| |||||||||||
|
|
|
| |||||||||||
Contract
Number: |
GS-10F-0093J |
|
| |||||||||||
|
|
|
| |||||||||||
Contract
Period: |
April 28,
1999 to April 27, 2009 |
|
| |||||||||||
|
|
|
| |||||||||||
Contractor: |
MACTEC
Development Corp. |
|
| |||||||||||
|
|
|
| |||||||||||
|
|
|
| |||||||||||
|
|
|
| |||||||||||
Contract
Administrator: |
Jeanette
Rufus |
|
| |||||||||||
|
Phone: |
770
360-0528 |
| |||||||||||
|
Fax: |
770
360-0540 |
| |||||||||||
|
E-mail: |
| ||||||||||||
|
|
|
| |||||||||||
Business
Size: |
L/B |
|
| |||||||||||
|
|
|
| |||||||||||
Central
Contractor Registration (CCR) Database: |
Registered
in DOD CCR Database, CAGE Code 3HK32 |
| ||||||||||||
|
|
|
| |||||||||||
DUNS
Number: |
063809714 |
|
| |||||||||||
|
|
|
| |||||||||||
For More
Information Contact: |
James
Purvis |
|
| |||||||||||
|
Phone: |
303
293-6068 |
| |||||||||||
|
Fax: |
303
273-5411 |
| |||||||||||
|
E-mail: |
| ||||||||||||
|
|
|
| |||||||||||
ABOUT
MACTEC Dev. Corp.: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC is
a leading engineering solutions firm providing integrated services for the
planning, permitting, design, development, construction management,
operation and maintenance, management, demolition, remediation, and
redevelopment of our country's infrastructure. We are one of the leading
providers of integrated infrastructure engineering services to over 3,000
clients, including industrial facilities, commercial facilities,
educational facilities, and federal facilities, as well as state and local
government agencies responsible for transportation, water, wastewater,
solid waste management, and civil projects. MACTEC
has 100 offices and over 4,000 employees located throughout the The
company's mission is to provide high quality, fully integrated, "one-stop"
strategic engineering program management with a focus on the complete life
cycle of the nation's infrastructure from initial planning through
permitting, design, construction, management and eventual demolition and
redevelopment. |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
is organized into three strategic divisions: |
| |||||||||||||
|
|
|
| |||||||||||
Consulting
Engineering and Sciences: Focuses
on Infrastructure Development Services:
Engineering
Studies
Planning
Permitting
Development
Design and Implementation
Facility
Upgrade Design and Implementation
Remedial
Design and Implementation
Closure
Design and Implementation
Redevelopment
Design and Implementation
Construction
Management
Compliance
Operations
& Maintenance |
| |||||||||||||
|
|
|
| |||||||||||
Government
Programs: Focuses
on Government Infrastructure Management Services:
Facility
Management
Process
Management
Data
Management
Program
Management
Project
Management
Staff
Augmentation
Outsourcing |
| |||||||||||||
|
|
|
| |||||||||||
Construction
Management: Focuses
on Infrastructure Redevelopment Services:
Facility
Construction
Facility
Upgrades
Facility
Remediation
Facility
Decontamination and Decommissioning/Demolition
(D&D)
Facility
Closure
Facility
Redevelopment
Construction
Management
Liability
Transfer The three
divisions often combine forces to provide fully integrated services to our
clients. Together we create successful partnerships with our clients that
foster trust, commitment, and communication. Our clients range from
Fortune 500 companies to federal government agencies to local and state
government agencies. All have depended on us to meet or exceed their
project needs. Our commitment to client satisfaction is absolute and it
shows by our high percentage of repeat customers. In Fiscal Year 2000 over
63% of MACTEC's clients were repeat customers and 95% of our revenue came
from repeat customers. At
MACTEC, we believe people are the link between technology and successful
contract performance. Our people are the company's greatest asset. By
empowering our staff, we build and lead successful project teams that are
dedicated to common goals. Our expert staff brings in-depth technical
knowledge and comprehensive field experience, thus eliminating the
inefficiencies and costly "learning curve" of a less experienced
contractor. Key to MACTEC's success is its ability to provide an
integrated approach involving teams of experienced engineers, scientists,
and technical staff who can deal successfully with every phase of the
infrastructure project life cycle, from planning through design,
permitting, construction management, operations, maintenance, demolition,
remediation, and redevelopment |
| |||||||||||||
The
cornerstone of MACTEC's corporate mission is to create value for our
clients in every project we perform.
Not only do we provide technical excellence in helping clients
manage complex projects in a safe, environmentally compliant, and
cost-effective manner, but also we have built our reputation on
understanding client needs, and acting to meet those needs in a way that
creates real value for our clients. At
MACTEC, we're committed and able to find the right solution for your
organization. Call on us and let us show you how we can add value to your
projects. |
| |||||||||||||
|
|
|
| |||||||||||
The
MACTEC Advantage: |
| |||||||||||||
|
|
|
| |||||||||||
Return
on Investment: Offering value-added services
focused on providing our clients with a positive return on
investment. |
| |||||||||||||
|
|
| ||||||||||||
Coordination
and Communication:
Providing
continual project communications to clients and project participants, and
providing coordination of activities to assure on-time and on-budget
performance. |
| |||||||||||||
|
|
| ||||||||||||
Liability
Transfer & Risk Sharing: Providing clients with options for
liability transfer or risk sharing on selected
projects. |
| |||||||||||||
|
|
| ||||||||||||
Quality
Processes: Offering quality assurance that is
designed and built into all our projects. |
| |||||||||||||
|
|
| ||||||||||||
Best-Fit
Solutions: Developing unique solutions
tailored to specific client needs. |
| |||||||||||||
|
|
| ||||||||||||
Significant
Cost Savings: Delivering services at significant
cost savings by employing innovative approaches. |
| |||||||||||||
|
|
|
| |||||||||||
Value-Added
Services: Providing world class expertise
and value engineering to add value to our clients'
projects. |
| |||||||||||||
|
|
|
| |||||||||||
SIN
899-1 - ENVIRONMENTAL PLANNING SERVICES &
DOCUMENTATION: |
| |||||||||||||
|
|
|
| |||||||||||
Environmental
Impact Statements and Assessments under the National Environmental Policy
Act (NEPA): |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will identify data needs, analyze existing data and collect new data as
needed (including site visits and interviews); perform sampling and
analysis; prepare human health risk and environmental impact evaluations;
prepare, document and deliver expert testimony; and attend and support
public meetings and hearings (including scoping meetings), including
development of information materials. |
| |||||||||||||
|
|
|
| |||||||||||
Economic,
Technical, and Risk Analyses in Support of Environmental
Needs: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will analyze options for environmental actions. We will identify data needs,
analyze existing data, collect new data as needed, and analyze
comments. We will conduct
regulatory and economic analyses, feasibility studies, hazard assessments,
and exposure and risk assessments. |
| |||||||||||||
|
|
|
| |||||||||||
Planning
Site Cleanups: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will apply quantitative cost-benefit analyses to prioritize cleanups. MACTEC will quantify uncertainty
in existing contaminant data.
Our staff created the Data Quality Objective (DQO) process and has
now incorporated decision theory and value of information. These quantitative tools, with
their linked 3-D graphics, assure cleanups are done smartly, within
regulatory compliance, and with stakeholder understanding and
consensus. |
| |||||||||||||
|
|
|
| |||||||||||
Web-Accessible
Databases: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will develop web sites to make accessible all pertinent data so interested
individuals can access the data for analysis, review, and comment. MACTEC is expert on assembling
large environmental databases that can be queried easily for the
answer. |
| |||||||||||||
|
|
|
| |||||||||||
RIFS/RDRA
and RFI/CMA: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will identify data needs, analyze existing data and collect new data as
needed; prepare appropriate planning documents for regulators to make
cost-effective decisions on cleanup approaches. MACTEC engages stakeholders and
regulators throughout the process to assure excellence in communication
and consensus at each step. |
| |||||||||||||
|
|
|
| |||||||||||
Endangered
Species, Wetlands, Watersheds, and other Natural Resource Management
Plans, Studies and Consultations |
| |||||||||||||
|
|
|
| |||||||||||
Archeological,
Historic and Other Cultural Resources Management Plans, Studies, and
Consultations |
| |||||||||||||
|
|
|
| |||||||||||
SIN
899-2 - ENVIRONMENTAL COMPLIANCE SERVICES: |
| |||||||||||||
|
|
|
| |||||||||||
Environmental
Compliance Audits: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will determine all applicable public laws and statutes; agency and command
regulations and directives; and other federal, state, and local
regulations. MACTEC will
apply these requirements in conduct of valid audits. We will evaluate findings, prepare
necessary documents and reports, and conduct comprehensive
out-briefs. |
| |||||||||||||
|
|
|
| |||||||||||
Compliance
Management Planning: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will develop management plans to cover policy; planning, implementation
and operation; checks and corrective actions; and management
reviews. |
| |||||||||||||
|
|
|
| |||||||||||
Pollution
Prevention Surveys |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will conduct pollution prevention surveys; develop pollution prevention
plans; establish inventories for hazardous materials; evaluate the
economics and technical feasibility of process changes and recycling
alternatives; and create databases to track progress in achieving
pollution prevention goals. |
| |||||||||||||
|
|
|
| |||||||||||
SIN
899-4 - WASTE MANAGEMENT SERVICES: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will analyze options under consideration for waste management
services. We will identify
data needs, analyze existing data and collect new data as needed; analyze
comments; and conduct regulatory and economic analyses, feasibility
studies, hazard assessments, and exposure and risk
assessments. |
| |||||||||||||
|
|
|
| |||||||||||
Services
include, but are not limited to, development of waste characterization
studies and recommendations for management strategy, such as identifying
recycling options.
Assessments could include studies on waste collection and transfer,
source reduction, and evaluation of energy and fuel
options. |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will supervise and/or conduct field work associated with waste clean-up
and management in compliance with applicable
permits. |
| |||||||||||||
|
|
|
| |||||||||||
SIN
899-8 REMEDIATION
SERVICES: |
| |||||||||||||
|
|
|
| |||||||||||
MACTEC
will conduct investigations, remedial action, long term monitoring, and
long term operation associated with environmental restoration activities
under CERCLA, RCRA, or other environmental regulations. |
| |||||||||||||
|
|
|
|
| ||||||||||
Remedial
actions include, but are not limited to containment, removal, treatment
(on and off-site), transportation and disposal. Contaminants may be involved
including hazardous, toxic, radioactive, petroleum-based and explosive
constituents or any compensation thereof. These contaminants may occur in
various environments including soils, sediments, sludges, liquids, air,
water debris, structures and various containers. |
| |||||||||||||
|
|
|
| |||||||||||
Landfill
closure, soil/sludge stabilization/solidification, water/groundwater
treatment, soil vapor extraction, excavation, dredging, underground
storage tank removal/closure, ground water extraction, dewatering,
bioremediation, thermal treatment, demolition and debris
removal |
| |||||||||||||
|
|
|
| |||||||||||
Operation
and maintenance (O&M) including short and long term O&M of various
types of hazardous waste facilities including but not limited to
groundwater/surface water facilities, soil vapor extraction, low
temperature thermal desorption, soil stabilization and radiological
decontamination and treatment.
|
| |||||||||||||
|
| |||||||||||||
On-Line
Access: |
| |||||||||||||
|
|
|
| |||||||||||
Order
Limitations: |
In
accordance with Clause 52.216-19: Minimum
$100; Maximum $1 million |
| ||||||||||||
|
|
|
| |||||||||||
Geographic
Coverage: |
Agency
locations nationwide |
| ||||||||||||
|
|
|
| |||||||||||
Points of
Production: |
MACTEC
and agency locations nationwide |
| ||||||||||||
|
|
|
| |||||||||||
Government
Commercial Credit Card: |
Mactec
accept all government credit cards |
| ||||||||||||
|
|
|
| |||||||||||
Foreign
Items: |
None |
|
| |||||||||||
|
|
|
| |||||||||||
Time of
Delivery: |
Specified
in negotiated Delivery Orders |
| ||||||||||||
|
|
|
| |||||||||||
F.O.B.
Points: |
FOB
Destination |
| ||||||||||||
|
|
|
| |||||||||||
Ordering
Address: |
MACTEC
Development Corp. |
| ||||||||||||
|
|
| ||||||||||||
|
|
| ||||||||||||
|
Jeanette
Rufus, 770 360-0528, mailto:djlavergne@mactec.com |
| ||||||||||||
|
|
|
| |||||||||||
Payment
Address: |
MACTEC
Development Corp. |
|
| |||||||||||
|
|
|
| |||||||||||
|
|
| ||||||||||||
|
|
|
| |||||||||||
Warranty
Provision: |
Standard
Commercial |
| ||||||||||||
|
|
|
| |||||||||||
Export
Packing Charges: |
Not
applicable |
| ||||||||||||
|
|
|
| |||||||||||
PRICING: |
|
|
| |||||||||||
|
| |||||||||||||
The labor
categories and rates identified below are for the following Environmental
Advisory Services: |
| |||||||||||||
|
|
|
| |||||||||||
SIN
899-1: Environmental Planning
Services |
| |||||||||||||
|
|
|
| |||||||||||
SIN
899-2: Environmental
Compliance Services |
| |||||||||||||
|
|
|
| |||||||||||
SIN
899-4: Waste Management
Services |
|
| ||||||||||||
|
|
|
| |||||||||||
Labor
Category |
Hourly
Rate |
Daily
Rate |
| |||||||||||
|
|
|
| |||||||||||
Executive
Management Consultant |
$199.52 |
$1,596.16 |
| |||||||||||
Program
Manager |
$139.14 |
$1113.12 |
| |||||||||||
Principal
Scientist/Engineer |
$118.13 |
$945.04 |
| |||||||||||
Lead
Scientist/Engineer |
$94.51 |
$756.08 |
| |||||||||||
Senior
Scientist/Engineer |
$81.39 |
$651.12 |
| |||||||||||
Scientist/Engineer |
$65.64 |
$525.12 |
| |||||||||||
Administrative
Support |
$44.63 |
$357.04 |
| |||||||||||
|
|
|
| |||||||||||
SIN
899-8: Remediation
Services |
|
|
| |||||||||||
|
|
|
| |||||||||||
Labor
Category |
Hourly
Rate |
Daily
Rate |
| |||||||||||
|
|
|
| |||||||||||
Remediation
Project Manager |
$90.86 |
$726.88 |
| |||||||||||
Remediation
Project Engineer |
$79.72 |
$637.76 |
| |||||||||||
Remediation
Superintendent |
$66.55 |
$532.40 |
| |||||||||||
Remediation
Field Engineer |
$64.30 |
$514.40 |
| |||||||||||
Remediation
Health & Safety Manager |
$85.73 |
$685.84 |
| |||||||||||
Remediation
Health & Safety Specialist |
$68.23 |
$545.84 |
| |||||||||||
Remediation
QA Manager |
$71.73 |
$573.84 |
| |||||||||||
Remediation
QA Specialist |
$53.30 |
$426.40 |
| |||||||||||
Remediation
Procurement Specialist |
$54.28 |
$434.24 |
| |||||||||||
Remediation
Cost Scheduler |
$51.46 |
$411.68 |
| |||||||||||
Remediation
Field Technician |
$46.86 |
$374.88 |
| |||||||||||
Heavy
Equipment Operator |
$50.02 |
$400.16 |
| |||||||||||
Heavy
Equipment Mechanic |
$47.33 |
$378.64 |
| |||||||||||
Secretary
I |
$33.19 |
$265.52 |
| |||||||||||
Secretary
II |
$36.97 |
$295.76 |
| |||||||||||
Secretary
III |
$40.22 |
$321.76 |
| |||||||||||
Secretary
IV |
$44.44 |
$355.52 |
| |||||||||||
Secretary
V |
$51.21 |
$409.68 |
| |||||||||||
Forklift
Operator |
$37.82 |
$302.56 |
| |||||||||||
Material
Coordinator |
$41.24 |
$329.92 |
| |||||||||||
Material
Expediter |
$41.24 |
$329.92 |
| |||||||||||
Laborer |
$28.63 |
$229.04 |
| |||||||||||
Engineering
Technician I |
$32.69 |
$261.52 |
| |||||||||||
Engineering
Technician II |
$39.37 |
$314.96 |
| |||||||||||
Engineering
Technician III |
$45.26 |
$362.08 |
| |||||||||||
Engineering
Technician IV |
$49.76 |
$398.08 |
| |||||||||||
Engineering
Technician V |
$56.30 |
$450.40 |
| |||||||||||
Engineering
Technician VI |
$67.46 |
$539.68 |
| |||||||||||
Environmental
Technician |
$42.64 |
$341.12 |
| |||||||||||
Truckdriver,
Heavy Truck |
$45.38 |
$363.04 |
| |||||||||||
Truckdriver,
Medium Truck |
$40.27 |
$322.16 |
| |||||||||||
Truckdriver,
Light Truck |
$32.57 |
$260.56 |
| |||||||||||
Truckdriver,
Tractor-Trailer |
$45.41 |
$363.28 |
| |||||||||||
|
|
|
| |||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Equipment
List |
Hourly |
Daily |
Weekly |
Discounted
Monthly |
|
|
|
|
|
Pickup Truck |
$10.10 |
$80.79 |
$403.94 |
$1,514.77 |
Mechanic
Truck/Welder |
$25.25 |
$201.97 |
$1,009.85 |
$3,786.92 |
Bobcat
(Bucket) |
$26.42 |
$211.39 |
$1,056.97 |
$3,963.65 |
Bobcat
with Attachment |
$33.66 |
$269.29 |
$1,346.46 |
$5,049.23 |
D75S
Loader |
$214.37 |
$1,714.99 |
$8,574.94 |
$32,156.04 |
CAT
9120 Loader |
$37.67 |
$301.34 |
$1,506.69 |
$5,650.09 |
CAT
Loader |
$83.53 |
$668.25 |
$3,341.25 |
$12,529.67 |
IH 165
Track Loader |
$46.39 |
$371.08 |
$1,855.42 |
$6,957.84 |
CASE
580 Backhoe |
$36.79 |
$294.34 |
$1,471.68 |
$5,518.81 |
CASE
235 Backhoe (Bucket) |
$179.13 |
$1,433.04 |
$7,165.20 |
$26,869.49 |
CASE
235 Backhoe (Breaker) |
$258.92 |
$2,071.40 |
$10,356.99 |
$38,838.70 |
CASE
235 Backhoe (Pulverizer) |
$229.62 |
$1,836.98 |
$9,184.89 |
$34,443.34 |
CASE
235 Backhoe (Shear) |
$280.11 |
$2,240.92 |
$11,204.59 |
$42,017.19 |
CASE
235 Backhoe (Grapple) |
$221.21 |
$1,769.66 |
$8,848.28 |
$33,181.04 |
CASE
245 Backhoe (Bucket) |
$277.69 |
$2,221.53 |
$11,107.64 |
$41,653.65 |
CASE
245 Backhoe (Grapple) |
$319.77 |
$2,558.14 |
$12,790.72 |
$47,965.19 |
JD 790
Backhoe (Breaker) |
$176.25 |
$1,410.02 |
$7,050.08 |
$26,437.79 |
PC200
Backhoe (Breaker) |
$196.75 |
$1,574.01 |
$7,870.07 |
$29,512.77 |
PC400
Backhoe (Bucket) |
$201.53 |
$1,612.25 |
$8,061.27 |
$30,229.76 |
PC400
Backhoe (Breaker) |
$281.33 |
$2,250.61 |
$11,253.06 |
$42,198.97 |
PC400
Backhoe (Pulverizer) |
$252.02 |
$2,016.19 |
$10,080.96 |
$37,803.61 |
PC400
Backhoe (Shear) |
$302.52 |
$2,420.13 |
$12,100.66 |
$45,377.46 |
PC400
Backhoe (Grapple) |
$243.61 |
$1,948.87 |
$9,744.35 |
$36,541.30 |
60 Ton
Conventional Crane |
$200.96 |
$1,607.68 |
$8,038.38 |
$30,143.92 |
14 CU
Yd Tandem |
$63.64 |
$509.10 |
$2,545.49 |
$9,545.58 |
50 CU
Yd Dump |
$273.95 |
$2,191.64 |
$10,958.18 |
$41,093.19 |
|
$72.94 |
$583.56 |
$2,917.78 |
$10,941.69 |
Office
Facilities |
$84.15 |
$673.23 |
$3,366.16 |
$12,623.08 |
3,500
Gallon Water Truck |
$44.11 |
$352.91 |
$1,764.54 |
$6,617.02 |
Burning
Outfit |
$50.49 |
$403.94 |
$2,019.69 |
$7,573.85 |